Machang Grand Bridge

The Machang Grand Bridge joins Gapo-dong, Masanhappo-gu and Gwisan-dong, Seongsan-gu in Changwon, Gyeongsangnam-do.
The cable-stayed bridge is 1.7 km long and 21m wide, with four round-trip lanes.

Machang Bay Bridge in Changwon in Gyeongsangnam-do, South Korea

This dual two-lane bridge joins Gapodong in Masanhappo-gu, Changwon in Gyeongsangnam-do and Guisangdong of
Seongsan-gu in Changwon, . The cable-stayed bridge is 1.7 km long and 21m wide, with four round-trip lanes.

Comprehensive Rebar Management System

· Managing subcontractors separately according to a separated ordering    
· Managing a delivery schedule separately according to the on-site schedule.
· Lack of taking prompt measures for the occurrence of defective products (Bent bar).
· Difficult to handle surplus or insufficient rebars.

· Managing subcontractors separately
    according to a separated ordering    

· Managing a delivery schedule separately                      according to the on-site schedule.
· Lack of taking prompt measures for the                          occurrence of defects (Bent bar).
· Difficult to handle leftover or insufficient rebars.

· Simplifies the on-site subcontractor selection process.     
· Simplifies quality control procedures.
· Increases management efficiency.   
· Increases a process efficiency through the unified communication channel with a construction site.

· Simplifies the field subtractor selection process.     
· Simplifies quality control procedures.
· Increases management efficiency.   
· Increases a process efficiency through the unified communication channel with a construction site.